Quick Quack Car Wash — Commercial Site Work

Grading & Excavation

Quick Quack Car Wash — Commercial Site Work

Site-prep earthwork for a Quick Quack Car Wash facility — mass grading, export, compaction, building pad over-excavation, recompaction, and pad certification to deliver a build-ready pad for subsequent vertical construction.

Location
Southern California
Project Type
Commercial Car Wash Facility
Timeline
Approximately 45 days.
County
Inland Empire

ScopeMass grading, export, lot compaction, building pad over-excavation, recompaction, and pad certification.

ChallengeRock-heavy site requiring efficient export and disposal logistics. Mendozer's relationships with Robertson and other aggregate processing facilities helped move material off-site efficiently.

EquipmentD6 dozer, 330 excavator, Super 10 dump trucks, sheep's foot roller, 5½-yard loader.

SolutionCoordinated export hauling to approved disposal and aggregate processing facilities; sequenced over-excavation, recompaction, and compaction testing to certify the building pad.

ResultsCompleted on time with no delays. Approximately 10,000–12,000 cubic yards of material exported. Pad certified for subsequent vertical construction.

Quick Quack Car Wash — Commercial Site Work photo 1
Quick Quack Car Wash — Commercial Site Work photo 2
Quick Quack Car Wash — Commercial Site Work photo 3
Discuss a Similar Project
Southern California Edison — Utility Site Work

Grading & Excavation

Southern California Edison — Utility Site Work

Earthwork and pad preparation for a Southern California Edison utility site — mass grading, fine grading, over-excavation, export, pad compaction, and pad certification.

Location
Southern California
Project Type
Utility / Industrial
Timeline
3 weeks.
County
Inland Empire

ScopeMass grading, fine grading, over-excavation, export (approximately 3,000 CY), pad compaction, and pad certification.

ChallengeDuring over-excavation, encountered wet clay with excessive moisture that would not achieve the required 90% compaction despite repeated attempts.

Equipment320 excavator, D6 dozer, water truck, 5½-yard loader.

SolutionRemoved unsuitable wet soil, replaced with rock, compacted rock to stabilize the base, then continued replacing and recompacting excavation material on the stabilized foundation.

Results90%+ compaction achieved after rock stabilization. Pad certified and turned over inspection-ready.

Southern California Edison — Utility Site Work photo 1
Southern California Edison — Utility Site Work photo 2
Southern California Edison — Utility Site Work photo 3
Discuss a Similar Project
Riverside Apartment Complex — Electrical Infrastructure Earthwork

Grading, Excavation & Asphalt

Riverside Apartment Complex — Electrical Infrastructure Earthwork

Earthwork to upgrade outdated electrical infrastructure at a Riverside apartment complex — connecting apartment infrastructure to the existing electrical source, with full roadway restoration.

Location
Riverside, CA
Project Type
Apartment / Utility Trench & Street Restoration
Timeline
Approximately 2 months across multiple mobilizations and phases.
County
Riverside County

ScopeSaw cutting, street demolition, approximately 300 ft of street/trench excavation, trenching, grading, backfill, compaction, street restoration, grinding, and asphalt overlay (approximately half the street). Electrical contractor installed conduit; Mendozer backfilled, compacted, and restored the roadway.

ChallengeApproximately 300 ft of trench through a very busy street with heavy, fast-moving traffic. Required traffic control, worker safety, maintained vehicle access, and daily steel plate coverage so the road could not remain open overnight.

Equipment8K mini excavator, skid steer, dump trucks, skip loader, trench shoring.

SolutionExcavated in sections; covered the open trench with steel plates at the end of each workday for vehicle traffic; reopened and continued excavation the following day until the full run was complete.

ResultsElectrical infrastructure upgraded for the apartment complex. Excavation, backfill, and compaction completed. Roadway restored with grind-and-overlay asphalt.

Riverside Apartment Complex — Electrical Infrastructure Earthwork photo 1
Riverside Apartment Complex — Electrical Infrastructure Earthwork photo 2
Riverside Apartment Complex — Electrical Infrastructure Earthwork photo 3
Discuss a Similar Project

Ready to Break Ground

Need a Reliable Earthwork Contractor in Southern California?

Get a fast, no-obligation estimate for your next commercial project. We handle excavation, grading, demolition, paving, and concrete from the Inland Empire to LA County.