
San Bernardino, CA · Industrial Redevelopment
Placeholder — San Bernardino Industrial Yard Slab Reconstruction
- Scope
- Failed slab demolition, subgrade remediation, reinforced slab-on-grade pour, and loading apron flatwork on a large-lot industrial yard repositioning project.
- Challenge
- Deteriorated existing concrete and uncertified subgrade required full reconstruction scope while agency pre-pour inspection windows and phased yard access compressed the improvement schedule.
- Result
- New slab and apron poured to spec with passing cylinder breaks and pre-pour inspection clearance before vertical construction mobilized. Placeholder — final client metrics pending.


