
Rialto, CA · Logistics Industrial
Placeholder — Rialto BNSF Corridor Warehouse Demolition
- Scope
- Full structural takedown, foundation removal, and site clearing on a 52,000 SF warehouse prior to large-lot mass grading on a build-to-suit distribution pad along the BNSF corridor.
- Challenge
- Asbestos-containing roofing materials and active logistics operations adjacent to the demo zone required phased takedown and controlled haul routes during San Bernardino County rain season.
- Result
- Bare pad delivered ahead of grading mobilization with recycling documentation and zero debris backlog blocking earthwork access. Placeholder — final client metrics pending.


