Banning, CA · Pass Area Logistics
Placeholder — Banning I-10 Corridor Distribution Sitework Package
- Scope
- Turnkey sitework including mass grading, utility trenching, storm drain installation, asphalt paving, concrete flatwork, and SWPPP compliance on a large-format distribution center along the Banning I-10 corridor.
- Challenge
- Desert-edge sandy soil conditions, multi-acre import/export quantities, and Riverside County multi-phase inspection requirements compressed the schedule between pad certification and a tenant improvement mobilization date tied to vertical construction.
- Result
- Build-ready pad delivered with passing compaction tests, utility backfill clearance, and paving turnover ahead of structural steel mobilization. Placeholder — final client metrics pending.